PJCMEDIA
SEO for ContractorsMeta Ads for ContractorsWebsite DesignCRM and AutomationGoogle LSA
Lead GenerationSEO for Remodelers
Case StudiesThesisGuidesAboutContact
Free Game Plan
PJCMEDIA

Growth systems for remodelers and home service contractors. One contractor per trade per market.

@pjcmediaParker LinkedInParker XJack LinkedIn

Services

  • SEO for Contractors
  • Meta Ads for Contractors
  • Website Design
  • CRM and Automation
  • Google LSA
  • Lead Generation
  • SEO for Remodelers

By Trade

  • General Contractors
  • Interior Remodelers
  • Exterior Remodelers
  • Deck Builders
  • Hardscapers

Company

  • Case Studies
  • Thesis
  • Guides
  • About
  • Contact

© 2026 PJC Media · JP Media LLC

Growth Platform

Sister company CrowdFlow

Facebook and Instagram Ads / Decks

Facebook ads for
deck builders

A deck runs $12,000 for a pressure-treated rebuild to $160,000 for a deck, porch and outdoor living package. At an average of $38,000 a signed job, the question is never what a lead costs. It is what a signed contract costs, and almost everything that decides that happens after the click.

Get My Free Game PlanSee the Receipts
average signed job
$38,000average signed job
typical cost per lead
$30 to $80typical cost per lead
contractor per market
1contractor per market
The Failure Mode

Two identical forms, a six times spread

A $14,000 rebuild and a $90,000 covered outdoor living space arrive looking exactly the same. Without material and scope in the form, you find out after the drive.

The season
Same shape as hardscape. Winter research, spring hiring, and a backlog into July by the end of March if the year is going to be a good one.
The decision window
Three to six weeks, and much longer for anything with a roof on it because that becomes a structural decision.
The Creative

What actually works for decks

Creative is most of the result on Meta, and it is trade-specific in a way targeting is not. These are the things that work here and the things that do not.

  • Composite in use, not empty. Furniture, people, evening light. An empty deck looks like lumber; a used one looks like the thing they want.

  • The roof or screening specifically. That is the three times contract and it is a different ad from a deck ad.

  • Railing and lighting detail. Composite buyers shop on detail because the material decision is already made.

  • Cost comparison creative. Composite against pressure-treated over twenty years converts well and pre-sells the upgrade.

The Form

The questions that decide what reaches your estimator

Screening belongs in the form, not in a phone call afterwards. These are the questions that matter in this trade, in the order they matter.

Fewer leads arrive and more of them sign. Every contractor we do this with is uncomfortable in month one and stops asking about it by month three.

  1. 01Decking material: pressure-treated, composite, or not sure yet?
  2. 02Approximate size.
  3. 03Is a roof, screening or lighting in scope? This finds the $90,000 build.
  4. 04New build or replacing an existing deck? Tear-out and footing condition change everything.
Proof

The same system, with the numbers on camera

$155Ksigned in 45 days

$155,000 in full gut remodels in 45 days

Watch and read it
$300Kin work sold

100+ leads and close to $300,000 in sold work

Watch and read it

$200,000 in signed work in 90 days, or you do not pay us.

One contractor per trade per market. You own everything we build.

Check My Market
Questions

What deck builders ask us

Typically $30 to $80 in our markets, moving with season and competition. That number on its own means little: what matters is cost per signed contract, and on an average $38,000 job a more expensive lead that closes is cheaper work than a cheap one that does not.

First enquiries usually inside the first week. The useful read is at three to four weeks, once there is enough data to tell which creative and which audience is producing work that actually signs.

Yours, always. Homeowners recognise houses that are not from their market, and in this trade stock creative underperforms real work by a wide margin. If the photography is not there we will tell you how to shoot it.

You do. We build in your Business Manager, your pixel, your audiences. If we part ways you keep the history and the learning, which is the part that took the money to build.

The form. Decking material: pressure-treated, composite, or not sure yet? That question alone changes the mix of what reaches your estimator.

Want this running for your decks business?

Book a free game plan. We will tell you what the terms in your market are worth, what your competitors are doing, and whether the market is still open.

  • $200K in 90 days or you do not pay
  • One contractor per trade per market
  • You own everything
Get My Free Game Plan

The other half of this for deck builders

SEO for deck builders

And every other trade

  • Kitchen Remodeling
  • Bathroom Remodeling
  • Paver Patios
  • Concrete
  • Siding and Exteriors
  • Basement Finishing
  • Roofing