PJCMEDIA
SEO for ContractorsMeta Ads for ContractorsWebsite DesignCRM and AutomationGoogle LSA
Lead GenerationSEO for Remodelers
Case StudiesThesisGuidesAboutContact
Free Game Plan
PJCMEDIA

Growth systems for remodelers and home service contractors. One contractor per trade per market.

@pjcmediaParker LinkedInParker XJack LinkedIn

Services

  • SEO for Contractors
  • Meta Ads for Contractors
  • Website Design
  • CRM and Automation
  • Google LSA
  • Lead Generation
  • SEO for Remodelers

By Trade

  • General Contractors
  • Interior Remodelers
  • Exterior Remodelers
  • Deck Builders
  • Hardscapers

Company

  • Case Studies
  • Thesis
  • Guides
  • About
  • Contact

© 2026 PJC Media · JP Media LLC

Growth Platform

Sister company CrowdFlow

Search / Kitchen Remodeling

SEO for
kitchen remodelers

A kitchen remodel runs $25,000 for a refresh to $110,000 and up for a full remodel with layout changes. The homeowners buying at the top of that range research for weeks before they ever type the word contractor, and the whole opportunity in this trade is being there for the part nobody writes for.

Get My Free Game PlanSee the Receipts
average signed job
$65,000average signed job
to move the terms worth having
3–6 moto move the terms worth having
contractor per market
1contractor per market
The Failure Mode

Leads go cold in week three

Kitchen buyers take six to ten weeks and most contractors follow up twice. The job goes to whoever was still politely in front of them in week five, which is a sequencing problem rather than a traffic problem.

The season
Steady all year with a real dip through December, and a January spike when people have spent three weeks hosting in a kitchen they hate.
The decision window
Six to ten weeks from first enquiry to signature. Nobody signs a $65,000 kitchen off one conversation, which is why the follow-up matters more here than the ad.
The Searches

What kitchen remodelers' customers actually type

Grouped by where the homeowner is in the decision. Most contractor sites only have content for the last group, which is why they only ever see the enquiries that already chose somebody.

Cost first

The largest volume in the trade and the least answered. Own it and you meet the buyer months before anyone else.

  • kitchen remodel cost [state]
  • average cost to redo a kitchen
  • kitchen renovation cost per square foot
  • is it cheaper to reface or replace cabinets
  • how much does a small kitchen remodel cost

Then design

Mid funnel. Your own photography beats a supplier's renderings every time.

  • small kitchen remodel ideas
  • open concept kitchen wall removal
  • kitchen island with seating ideas
  • galley kitchen remodel before and after
  • white shaker cabinets with quartz

Then a contractor

Decided in the map pack within an hour. Reviews and response time are the whole game.

  • kitchen remodeler near me
  • kitchen remodeling contractor [city]
  • best kitchen remodel company [county]
  • licensed kitchen contractor [city]
  • kitchen remodeling companies near me
The Build

What has to exist to rank for those

Step 01

Publish the cost page first

A page that gives honest installed ranges with the five variables that move them will outrank nine galleries, because it is the only one answering the question. It also pre-qualifies: the enquiries that arrive already know the range.

Step 02

One page per project type

Kitchen, galley kitchen, small kitchen, open-concept conversion. These are different searches with different intent, and one services page trying to cover all of them ranks for none.

Step 03

Before and after as content, not decoration

A project page with the starting condition, the scope, the timeline and the finished photographs ranks for design searches and converts better than a lightbox gallery, because it is the thing the homeowner is trying to imagine.

Proof

The same system, with the numbers on camera

$155Ksigned in 45 days

$155,000 in full gut remodels in 45 days

Watch and read it
$300Kin work sold

100+ leads and close to $300,000 in sold work

Watch and read it

$200,000 in signed work in 90 days, or you do not pay us.

One contractor per trade per market. You own everything we build.

Check My Market
Questions

What kitchen remodelers ask us

Three to six months to move on the terms worth having, longer in a dense metro. Map pack and Google Business Profile work can move inside weeks, which is why it is usually the first thing we do.

For kitchen remodelers it is almost always the cost page. A page that gives honest installed ranges with the five variables that move them will outrank nine galleries, because it is the only one answering the question. It also pre-qualifies: the enquiries that arrive already know the range.

Ranges, with the variables that move them, not quotes. The homeowner is going to find a number somewhere. The contractor who gives it to them honestly gets the trust and an enquiry that already knows the range.

Only where we can say something true and specific about that market. Spinning a page per town is scaled content abuse under Google's spam policy and it is what gets sites deindexed.

Yes. Your site, your content, your rankings. Search is the half of this that compounds, and it should compound into something that stays yours.

Want this running for your kitchen remodeling business?

Book a free game plan. We will tell you what the terms in your market are worth, what your competitors are doing, and whether the market is still open.

  • $200K in 90 days or you do not pay
  • One contractor per trade per market
  • You own everything
Get My Free Game Plan

The other half of this for kitchen remodelers

Facebook ads for kitchen remodelers

And every other trade

  • Bathroom Remodeling
  • Paver Patios
  • Concrete
  • Decks
  • Siding and Exteriors
  • Basement Finishing
  • Roofing